Appendix B – Engineering Checklists and Standard Details
Adams County Government is committed to providing a website that is accessible to the widest possible audience and advancing technology accessibility in all our county information and communication technology (“ICT”). We are actively working to increase the accessibility and usability of our ICT in accordance with Colorado Laws For Persons With Disabilities, HB 21-1110, as amended, and the rules promulgated by the Office of Information Technology of the State of Colorado. To view our accessibility statement, please click here.
To view any of these documents, click a link below.
- Attachment #B-1 Project Title Sheet
- Attachment #B-2 Project Site Plan
- Attachment #B-3 Level 1 – Storm Drainage Plan
- Attachment #B-4 Level 2 – Storm Drainage Plan
- Attachment #B-5 Level 2 – Storm Drainage Report
- Attachment #B-6 Level 3 – Storm Drainage Plan(s)
- Attachment #B-7 Level 3 – Storm Drainage Study Report
- Attachment #B-8 Evidence of Existing and Predicted Problems
- Attachment #B-9 Engineer Certification of Drainage Report
- Attachment #B-10 Roadway Plan and Profiles
- Attachment #B-11 Roadway – Cross-Sections and Typical Roadway Sections
- Attachment #B-12 Final Grading Plan
- Attachment #B-13 SWMP Checklist Part 1 – Narrative Report
- Attachment #B-13.1 SWMP Checklist Part 2 – Site Plans
- Attachment #B-13.2 SWMP Required Template
- Attachment #B-13.3 Erosion Control Standard Notes
- Attachment #B-14 Storm Drainage Facilities Operation and Maintenance Manual
- Attachment #B-15 Final Approval and As-Built Submittals